Capital Requirements and Busbar Costs for Power in the Ohio River Basin, 1985 and 2000
I will be using this book for:

Capital Requirements and Busbar Costs for Power in the Ohio River Basin, 1985 and 2000

by U S Environmental Protection Agency

regional studies energy economics
1 Star 2 Star 3 Star 4 Star 5 Star
0.0 out of 5 stars (0 ratings)

This technical study from the U.S. Environmental Protection Agency examines capital requirements and busbar costs for electric power in the Ohio River Basin. Its focus on the years 1985 and 2000 makes it a useful reference for understanding historical energy planning and projected electricity costs.

About This Book

This study examines capital requirements for electric power in the Ohio River Basin.

It focuses on busbar costs, a measure associated with the cost of electricity at the generating station.

The work compares conditions or projections for the years 1985 and 2000.

Prepared by the U.S. Environmental Protection Agency, it provides a focused reference for historical power-planning and cost analysis.

Reviews

No reviews yet. Be the first to review this book!


Write a Review
I will be using this book for: